Migrate Configuration to New Server
The typical tasks when Rapid SCADA migration to another server is needed:
- The software deployment on a production server when the configuration has been completed using a developer workstation.
- Server replacement.
The steps to migrate a configuration are:
- Ensure that connections between the server and the devices are properly configured: the required serial ports exist, industrial controllers available via the network, etc.
- Install Rapid SCADA on the new server, but do not start the Server and Communicator services.
- Stop the Server and Communicator services on the obsolete server. Switch startup type of these services to Manual.
-
Copy the data archive located in the following directories from the obsolete server to the new server:
C:\SCADA\ArchiveDAT
C:\SCADA\ArchiveDATCopy -
Transfer the configuration from the obsolete to the new server in one of the following ways.
-
Copy the content of the directories listed below from the obsolete to the new server (default directories are shown):
C:\SCADA\BaseDAT
C:\SCADA\Interface
C:\SCADA\Projects
C:\SCADA\ScadaAgent\Config
C:\SCADA\ScadaComm\Config
C:\SCADA\ScadaServer\Config
C:\SCADA\ScadaWeb\config
C:\SCADA\ScadaWeb\storage - Open the project in the Administrator application and upload the configuration to the new server with the button, unchecking the Restart Server and Restart Communicator checkboxes.
-
Copy the content of the directories listed below from the obsolete to the new server (default directories are shown):
- Start the Server and Communicator services on the new server.
- Check whether the new server operates well.